KOHLERGENERATORSAuthorized dealer
Benefiel Electric & General Construction
← Main business website
Kohler manufacturer illustration: RDT-CFNC-200BSEQS3 RDT ATS - 200-amp, Service Entrance, 42 space Load Center
Manufacturer product illustration. Finish and selected configuration may vary.

Kohler · RDT-CFNC-200BSEQS3

RDT ATS - 200-amp, Service Entrance, 42 space Load Center

The Kohler RDT-CFNC-200BSEQS3 is listed as RDT ATS - 200-amp, Service Entrance, 42 space Load Center. Match the electrical rating, phase and installation requirements to your generator system before selecting a switch.

Starting at $1,539.00* MSRP · USD

*Starting price in US dollars. Does not include installation, generator, accessories or costs to export outside the US.

Equipment pricing is not a complete installed price. Confirm package contents, compatibility, current pricing and availability with BEGC.

Know the configuration

Product specifications.

Catalog ratings may vary with fuel, phase, voltage and selected options. Review the exact configuration and written manufacturer warranty terms before ordering.

Model number
RDT-CFNC-200BSEQS3
Voltage options in V (configuration-dependent)
240
Phase configurations
Single-phase
Transfer-switch amperage (A)
200
Poles
2
Wires
3
Enclosure rating
NEMA 3R
Enclosure material
Aluminum
Installation environment
Indoor or outdoor
Transfer-switch type
Service entrance
Load center
w/Load Center
Load-center circuits
42 spaces
Controller
MPAC 500
Generator compatibility
All Single Phase KOHLER Residential/Small Business Generators
Dimensions (catalog configuration)
967 mm x 762 mm x 165 mm (38.1 in. x 30.0 in. x 6.5 in.)
Weight (lb)
70

Catalog data checked October 12, 2026. Manufacturer technical documents consulted: g11151.pdf. Metric weight was not reproduced because the source contains inconsistent conversions for some models.

Keep exploring

More transfer switches.

View this category →

Your home. Your next step.

Let’s plan your backup power.

Talk with BEGC about equipment, your electrical needs and a project-specific estimate.